{"id":1726,"date":"2025-11-10T11:29:46","date_gmt":"2025-11-10T11:29:46","guid":{"rendered":"https:\/\/dev1.kenyaonline.com\/crvwda\/?page_id=1726"},"modified":"2026-02-25T10:10:57","modified_gmt":"2026-02-25T10:10:57","slug":"baringo","status":"publish","type":"page","link":"https:\/\/dev1.kenyaonline.com\/crvwda\/baringo\/","title":{"rendered":"Baringo"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"1726\" class=\"elementor elementor-1726\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c33270f e-flex e-con-boxed e-con e-parent\" data-id=\"c33270f\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-eaa6962 elementor-widget elementor-widget-heading\" data-id=\"eaa6962\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Baringo\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-76ebec9 e-flex e-con-boxed e-con e-parent\" data-id=\"76ebec9\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a7f6980 elementor-widget elementor-widget-text-editor\" data-id=\"a7f6980\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Major Flagship Infrastructure<\/p><p style=\"padding-left: 40px;\">\u2022 Chemususu Dam Water Supply Project: The project has reached an overall completion status of 98%. Civil works for the treatment plant and the main 5,000m\u00b3 reservoir at Baringo High School are completed. Outstanding works include pressure testing 150km of pipeline and the procurement of operational equipment (excavators and billing software). It serves 300,000 people across Eldama Ravine, Mogotio, and Nakuru.<br \/>\u2022 Kirandich Dam Phase II Water Supply Project: Serving Kabarnet Town, this project is currently at 41% overall physical progress. Key components include: <br \/>o Water Supply Works: 60% complete.<br \/>o Sewerage System: 31% complete.<br \/>o Reservoir Protection from Siltation: 77% complete.<br \/>o Management Office Rehabilitation: 33% complete.<br \/>\u2022 Eldama Ravine Sewerage Project: This National Urban Program project is in the tendering and documentation repackaging phase. It is designed to serve 57,563 people with a 53km sewerage network.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-5484f27 e-flex e-con-boxed e-con e-parent\" data-id=\"5484f27\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e52bc8c e-n-tabs-mobile elementor-widget elementor-widget-n-tabs\" data-id=\"e52bc8c\" data-element_type=\"widget\" data-settings=\"{&quot;horizontal_scroll&quot;:&quot;disable&quot;}\" data-widget_type=\"nested-tabs.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-tabs\" data-widget-number=\"240303244\" aria-label=\"Tabs. Open items with Enter or Space, close with Escape and navigate using the Arrow keys.\">\n\t\t\t<div class=\"e-n-tabs-heading\" role=\"tablist\">\n\t\t\t\t\t<button id=\"e-n-tab-title-2403032441\" class=\"e-n-tab-title\" aria-selected=\"true\" data-tab-index=\"1\" role=\"tab\" tabindex=\"0\" aria-controls=\"e-n-tab-content-2403032441\" style=\"--n-tabs-title-order: 1;\">\n\t\t\t\t\t\t<span class=\"e-n-tab-title-text\">\n\t\t\t\tCOMPLETED PROJECTS (2020 to Date)\t\t\t<\/span>\n\t\t<\/button>\n\t\t\t\t<button id=\"e-n-tab-title-2403032442\" class=\"e-n-tab-title\" aria-selected=\"false\" data-tab-index=\"2\" role=\"tab\" tabindex=\"-1\" aria-controls=\"e-n-tab-content-2403032442\" style=\"--n-tabs-title-order: 2;\">\n\t\t\t\t\t\t<span class=\"e-n-tab-title-text\">\n\t\t\t\tONGOING PROJECTS\t\t\t<\/span>\n\t\t<\/button>\n\t\t\t\t\t<\/div>\n\t\t\t<div class=\"e-n-tabs-content\">\n\t\t\t\t<div id=\"e-n-tab-content-2403032441\" role=\"tabpanel\" aria-labelledby=\"e-n-tab-title-2403032441\" data-tab-index=\"1\" style=\"--n-tabs-title-order: 1;\" class=\"e-active elementor-element elementor-element-b9b70a3 e-con-full e-flex e-con e-child\" data-id=\"b9b70a3\" data-element_type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-22ecf90 e-flex e-con-boxed e-con e-child\" data-id=\"22ecf90\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f551967 elementor-widget elementor-widget-text-editor\" data-id=\"f551967\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<table width=\"624\"><thead><tr><td><p><strong>No.<\/strong><\/p><\/td><td><p><strong>Project Name<\/strong><\/p><\/td><td width=\"203\"><p><strong>Scope of Works<\/strong><\/p><\/td><td><p><strong>Sub-County<\/strong><\/p><\/td><td><p><strong>Beneficiaries<\/strong><\/p><\/td><\/tr><\/thead><tbody><tr><td><p>40<\/p><\/td><td><p>Chemususu LMC (Mogotio Lot 1)<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 108m\u00b3 steel tank; 48.1km pipeline<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>12,500<\/p><\/td><\/tr><tr><td><p>41<\/p><\/td><td><p>Chemususu LMC (Mogotio Lot 2)<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 2No. 100m\u00b3 tanks; 25.6km pipeline<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>8,000<\/p><\/td><\/tr><tr><td><p>42<\/p><\/td><td><p>Chemususu LMC (E\/Ravine Lot 1)<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Masonry tank; 38.1km pipeline<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>15,000<\/p><\/td><\/tr><tr><td><p>43<\/p><\/td><td><p>Chemususu LMC (E\/Ravine Lot 2)<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 50m\u00b3 elevated tank; 32km pipeline<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>12,000<\/p><\/td><\/tr><tr><td><p>44<\/p><\/td><td><p>Bekibon Water Supply<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Intake, weir, sump, 100m\u00b3 tank<\/p><\/td><td><p>Baringo South<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>45<\/p><\/td><td><p>Tian Borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Equipping and civil works<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>46<\/p><\/td><td><p>Katabwa Water Project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Intake weir, pipeline, masonry tank<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>4,000<\/p><\/td><\/tr><tr><td><p>47<\/p><\/td><td><p>Kaptirgen (JICA) Project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 BH rehab &amp; Kamweton pipeline extension<\/p><\/td><td><p>Baringo North<\/p><\/td><td><p>2,500<\/p><\/td><\/tr><tr><td><p>48<\/p><\/td><td><p>Tangulbei Water Pan<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 18,000m\u00b3 water pan construction<\/p><\/td><td><p>Tiaty<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>49<\/p><\/td><td><p>Cheploch Water Pan<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 15,000m\u00b3 water pan construction<\/p><\/td><td><p>Baringo South<\/p><\/td><td><p>2,500<\/p><\/td><\/tr><tr><td><p>50<\/p><\/td><td><p>Kataron Water Pan<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Construction of water pan<\/p><\/td><td><p>Baringo North<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>51<\/p><\/td><td><p>Kositei Water Pan<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Construction of water pan<\/p><\/td><td><p>Baringo South<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>52<\/p><\/td><td><p>Muchukwo WP<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Equipping and civil works<\/p><\/td><td><p>Majimoto<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>53<\/p><\/td><td><p>Kipteweret WP<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Equipping and civil works<\/p><\/td><td><p>Bartabwa<\/p><\/td><td><p>2,500<\/p><\/td><\/tr><tr><td><p>54<\/p><\/td><td><p>Kapsok Borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Diagnosis and rehabilitation<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>2,000<\/p><\/td><\/tr><tr><td><p>55<\/p><\/td><td><p>Kabarnet Boys BH<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Equipping and civil works<\/p><\/td><td><p>Baringo Central<\/p><\/td><td><p>2,000<\/p><\/td><\/tr><tr><td><p>56<\/p><\/td><td><p>Kaptiegan WP<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Last Mile Connectivity (LMC)<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>57<\/p><\/td><td><p>Kaptana LMC<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Last Mile Connectivity (LMC)<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>58<\/p><\/td><td><p>Simotwe LMC<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Last Mile Connectivity (LMC)<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>59<\/p><\/td><td><p>Kipsogon-Logiri<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Last Mile Connectivity (LMC)<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>60<\/p><\/td><td><p>Ramacha Borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Drilling and capping<\/p><\/td><td><p>Baringo<\/p><\/td><td><p>1,500<\/p><\/td><\/tr><tr><td><p>1<\/p><\/td><td width=\"154\"><p>Civil works for reinstatement of Kabulyot water project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Rehabilitation of the existing pipeline network<\/p><\/td><td><p>Baringo<\/p><\/td><td><p>3000<\/p><\/td><\/tr><tr><td><p>2<\/p><\/td><td width=\"154\"><p>Civil works for oldebes water project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Tank construction and Conveyance system<\/p><\/td><td><p>Baringo<\/p><\/td><td><p>1500<\/p><\/td><\/tr><tr><td><p>3<\/p><\/td><td width=\"154\"><p>Construction works for Soibei community water project<\/p><\/td><td width=\"203\"><ul><li>Completion of 100m\u00b3 masonry tank<\/li><\/ul><\/td><td><p>Baringo<\/p><\/td><td><p>300<\/p><\/td><\/tr><tr><td><p>4<\/p><\/td><td width=\"154\"><p>Completion of Tugumoi-Tinonei and Chepnyogoson water project<\/p><\/td><td width=\"203\"><ul><li>Shutter roof slab and plastering on the exterior wall of the tank.<\/li><\/ul><\/td><td><p>Baringo<\/p><\/td><td><p>570<\/p><\/td><\/tr><tr><td><p>5<\/p><\/td><td width=\"154\"><p>Kimotony water pan<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Excavation and Earthworks.<br \/>Draw-off System.<br \/>Cattle Trough.<br \/>Fencing.<br \/>Toilets<\/p><\/td><td><p>Baringo<\/p><\/td><td><p>2000<\/p><\/td><\/tr><tr><td><p>6<\/p><\/td><td width=\"154\"><p>Mochongoi water project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Construction of intake works, Gravity main, rising main, 50m3 and 100m3 masonry tanks, pump house, solarisation, and Fencing<\/p><\/td><td><p>Baringo South<\/p><\/td><td><p>3000<\/p><\/td><\/tr><tr><td><p>7<\/p><\/td><td width=\"154\"><p>Solarization of Ndabibi borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Solar Equipping<br \/>Fencing works<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>2000<\/p><\/td><\/tr><tr><td><p>8<\/p><\/td><td width=\"154\"><p>Solar equipping of olkokwe community borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Solarization of borehole<br \/>Rehabilitation of tank<br \/>Construction of water kiosk and cattle trough<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>700<\/p><\/td><\/tr><tr><td><p>9<\/p><\/td><td width=\"154\"><p>Tuiseru borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Drilling and test pumping.installation of pumping system and solar equipment. Construction of water kiosk with 10m3 plastic tank. Constructiojn of cattle trough. Pipework and fitting. Fencing and gate<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>600<\/p><\/td><\/tr><tr><td><p>10<\/p><\/td><td width=\"154\"><p>Boito Secondary School Borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Drilling Equipping and<br \/>\u00a0Civil Works<\/p><\/td><td><p>Eldama ravine<\/p><\/td><td><p>2500<\/p><\/td><\/tr><tr><td><p>11<\/p><\/td><td width=\"154\"><p>Nato Community Borehole Wp<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Drilling Equipping and Civil Works<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>2000<\/p><\/td><\/tr><tr><td><p>12<\/p><\/td><td width=\"154\"><p>Kabartonjo Referral hospital<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Drilling, Equipping and Civil works<\/p><\/td><td><p>Baringo North<\/p><\/td><td><p>50 Outpatients per day and 24 bed capacity Inpatients<\/p><\/td><\/tr><tr><td><p>13<\/p><\/td><td width=\"154\"><p>Civil works for Lokoiwo water project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Pipe works<br \/>Spring protection<br \/>Construction of 100m<sup>3<\/sup> and 50m<sup>3<\/sup> masonry tanks<\/p><\/td><td><p>Baringo North<\/p><\/td><td><p>1500<\/p><\/td><\/tr><tr><td><p>14<\/p><\/td><td width=\"154\"><p>Orinie Primary School Borehole Water Project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Equipping and Civil Works<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>1000<\/p><\/td><\/tr><tr><td><p>15<\/p><\/td><td width=\"154\"><p>Equipping and civil works for Solian girls secondary school borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Equipping and Civil Works<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>1200<\/p><\/td><\/tr><tr><td><p>16<\/p><\/td><td width=\"154\"><p>Equipping and civil works for Tandui community borehole<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Equipping and Civil works<\/p><\/td><td><p>Baringo Central<\/p><\/td><td><p>2000<\/p><\/td><\/tr><tr><td><p>17<\/p><\/td><td width=\"154\"><p>Tolmo water project<\/p><\/td><td width=\"203\"><p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Construction of 100m3 masonry tank and distribution pipeline<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>1200<\/p><\/td><\/tr><tr><td><p>18<\/p><\/td><td width=\"154\"><p>Tinosiek borehole<\/p><\/td><td width=\"203\"><ul><li>Drilling and test pumping.installation of pumping system and solar equipment. Construction of water kiosk with 10m3 plastic tank.<\/li><li>Constructiojn of cattle trough. Pipework and fitting. Fencing and gate<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>400<\/p><\/td><\/tr><tr><td><p>19<\/p><\/td><td width=\"154\"><p>Asenwe Communitty Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>1200<\/p><\/td><\/tr><tr><td><p>20<\/p><\/td><td width=\"154\"><p>Lemelok Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Baringo South<\/p><\/td><td><p>1600<\/p><\/td><\/tr><tr><td><p>21<\/p><\/td><td width=\"154\"><p>Kupotwin Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Tiaty<\/p><\/td><td><p>500<\/p><\/td><\/tr><tr><td><p>22<\/p><\/td><td width=\"154\"><p>Kaiso Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Baringo Central<\/p><\/td><td><p>2500<\/p><\/td><\/tr><tr><td><p>22<\/p><\/td><td width=\"154\"><p>Kabergei Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>450<\/p><\/td><\/tr><tr><td><p>23<\/p><\/td><td width=\"154\"><p>Marram (Kacheptuyo)<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Tiaty<\/p><\/td><td><p>400<\/p><\/td><\/tr><tr><td><p>24<\/p><\/td><td width=\"154\"><p>Tenges Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Baringo Central<\/p><\/td><td><p>3000<\/p><\/td><\/tr><tr><td><p>25<\/p><\/td><td width=\"154\"><p>Tabagon Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Baringo Central<\/p><\/td><td><p>1480<\/p><\/td><\/tr><tr><td><p>26<\/p><\/td><td width=\"154\"><p>Rimo Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Baringo North<\/p><\/td><td><p>800<\/p><\/td><\/tr><tr><td><p>27<\/p><\/td><td width=\"154\"><p>Sesoche Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>1300<\/p><\/td><\/tr><tr><td><p>28<\/p><\/td><td width=\"154\"><p>Kabarbaya Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>750<\/p><\/td><\/tr><tr><td><p>29<\/p><\/td><td width=\"154\"><p>Kapyemit Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>500<\/p><\/td><\/tr><tr><td><p>30<\/p><\/td><td width=\"154\"><p>Mosuro Community Borehole Wp<\/p><\/td><td width=\"203\"><ul><li>Drilling Equipping and Civil Works<\/li><\/ul><\/td><td><p>Baringo South<\/p><\/td><td><p>400<\/p><\/td><\/tr><tr><td><p>31<\/p><\/td><td width=\"154\"><p>Mogotio Sub-county hospital<\/p><\/td><td width=\"203\"><ul><li>Drilling, Equipping and Civil works<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>70 Outpatients per day and 150 bed capacity Inpatients<\/p><\/td><\/tr><tr><td><p>32<\/p><\/td><td width=\"154\"><p>Kipkaech(Ngetmoi) dispensary<\/p><\/td><td width=\"203\"><ul><li>Drilling, Equipping and Civil works<\/li><\/ul><\/td><td><p>Baringo Central<\/p><\/td><td><p>50 Outpatients per day<\/p><\/td><\/tr><tr><td><p>33<\/p><\/td><td width=\"154\"><p>Kotulpogh Bh<\/p><\/td><td width=\"203\"><ul><li>Drilling and test pumping.installation of pumping system and solar equipment. Construction of water kiosk with 10m<sup>3<\/sup> plastic tank. Construction of cattle trough. Pipework and fitting. Fencing and gate<\/li><\/ul><\/td><td><p>Tiaty<\/p><\/td><td><p>300<\/p><\/td><\/tr><tr><td><p>34<\/p><\/td><td width=\"154\"><p>Kiplombe\u00a0 Secondary school borehole<\/p><\/td><td width=\"203\"><ul><li>Drilling and test pumping.installation of pumping system and solar equipment. Construction of water kiosk with 10m<sup>3<\/sup> plastic tank. Constructiojn of cattle trough. Pipework and fitting. Fencing and gate<\/li><\/ul><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>600<\/p><\/td><\/tr><tr><td><p>35<\/p><\/td><td width=\"154\"><p>Maji Nyekundu\u00a0 Borehole<\/p><\/td><td width=\"203\"><ul><li>Drilling , Equipping and civil works<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>2000<\/p><\/td><\/tr><tr><td><p>36<\/p><\/td><td width=\"154\"><p>KapKiamo Primary School Borehole<\/p><\/td><td width=\"203\"><ul><li>Drilling,equipping and civil works<\/li><\/ul><\/td><td><p>Baringo North<\/p><\/td><td><p>1800<\/p><\/td><\/tr><tr><td><p>37<\/p><\/td><td width=\"154\"><p>Lelgel Primary School Borehole<\/p><\/td><td width=\"203\"><ul><li>Equipping and civil works<\/li><\/ul><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>2500<\/p><\/td><\/tr><tr><td><p>38<\/p><\/td><td width=\"154\"><p>Makoi water project<\/p><\/td><td width=\"203\"><ul><li>Construction of 3No. water kiosks, 5km pipeline 1No. 50m3 masonry tank<\/li><\/ul><\/td><td><p>Mogotio<\/p><\/td><td><p>3000<\/p><\/td><\/tr><tr><td><p>39<\/p><\/td><td width=\"154\"><p>Lolmolo-Kokorwonin<\/p><\/td><td width=\"203\"><ul><li>Construction of 100m3 masonry tank and 12km pipeline<\/li><\/ul><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>1000<\/p><\/td><\/tr><tr><td><p>\u00a0<\/p><\/td><td width=\"154\"><p>\u00a0<\/p><\/td><td><p>\u00a0<\/p><\/td><td><p>\u00a0<\/p><\/td><td><p>\u00a0<\/p><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div id=\"e-n-tab-content-2403032442\" role=\"tabpanel\" aria-labelledby=\"e-n-tab-title-2403032442\" data-tab-index=\"2\" style=\"--n-tabs-title-order: 2;\" class=\" elementor-element elementor-element-69224f0 e-con-full e-flex e-con e-child\" data-id=\"69224f0\" data-element_type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-c2eeb7f e-flex e-con-boxed e-con e-child\" data-id=\"c2eeb7f\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c345230 elementor-widget elementor-widget-text-editor\" data-id=\"c345230\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>This list includes 17 active projects.<\/p><table><thead><tr><td><p>No.<\/p><\/td><td><p>Project Name<\/p><\/td><td><p>Progress Status<\/p><\/td><td><p>Sub-County<\/p><\/td><td><p>Remarks<\/p><\/td><\/tr><\/thead><tbody><tr><td><p>1<\/p><\/td><td><p>Solian-Kirobon LMC<\/p><\/td><td><p>95%<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>Pipeline\/tank done; awaiting fittings<\/p><\/td><\/tr><tr><td><p>2<\/p><\/td><td><p>Kiplombe LMC<\/p><\/td><td><p>95%<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>40.36km pipeline laid; testing ongoing<\/p><\/td><\/tr><tr><td><p>3<\/p><\/td><td><p>Kiptoim-Kures LMC<\/p><\/td><td><p>98%<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>Awaiting branding and handover<\/p><\/td><\/tr><tr><td><p>4<\/p><\/td><td><p>Lotwala Borehole<\/p><\/td><td><p>90%<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>Equipping\/civil works complete<\/p><\/td><\/tr><tr><td><p>5<\/p><\/td><td><p>Kampi ya Samaki<\/p><\/td><td><p>80%<\/p><\/td><td><p>Baringo South<\/p><\/td><td><p>UF and RO plant assembled on site<\/p><\/td><\/tr><tr><td><p>6<\/p><\/td><td><p>Bartulgel Community BH<\/p><\/td><td><p>80%<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>Civil works complete; awaiting equipping<\/p><\/td><\/tr><tr><td><p>7<\/p><\/td><td><p>Mochongoi-Ngorobich LMC<\/p><\/td><td><p>70%<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>18m steel tank tower complete<\/p><\/td><\/tr><tr><td><p>8<\/p><\/td><td><p>Akule Water Pan<\/p><\/td><td><p>80%<\/p><\/td><td><p>Tiaty<\/p><\/td><td><p>Excavation done; sill\/stone pitching pending<\/p><\/td><\/tr><tr><td><p>9<\/p><\/td><td><p>Kangoria Water Pan<\/p><\/td><td><p>80%<\/p><\/td><td><p>Tiaty<\/p><\/td><td><p>Excavation done; sill pending<\/p><\/td><\/tr><tr><td><p>10<\/p><\/td><td><p>Kapkosom Water Project<\/p><\/td><td><p>30%<\/p><\/td><td><p>Baringo South<\/p><\/td><td><p>Sump complete; tank construction ongoing<\/p><\/td><\/tr><tr><td><p>11<\/p><\/td><td><p>Kanjulul Water Pan<\/p><\/td><td><p>30%<\/p><\/td><td><p>Eldama Ravine<\/p><\/td><td><p>Progress hindered by heavy rains<\/p><\/td><\/tr><tr><td><p>12<\/p><\/td><td><p>Chemogoch LMC<\/p><\/td><td><p>25%<\/p><\/td><td><p>Mogotio<\/p><\/td><td><p>Slow progress due to cashflow issues<\/p><\/td><\/tr><tr><td><p>13<\/p><\/td><td><p>Kaboro Phase III<\/p><\/td><td><p>Ongoing<\/p><\/td><td><p>Baringo North<\/p><\/td><td><p>30m\u00b3 tank and booster pump station<\/p><\/td><\/tr><tr><td><p>14<\/p><\/td><td><p>Kaptumo Phase III<\/p><\/td><td><p>Ongoing<\/p><\/td><td><p>Baringo Central<\/p><\/td><td><p>Solarization and 100m\u00b3 tank<\/p><\/td><\/tr><tr><td><p>15<\/p><\/td><td><p>Kaptiriony Secondary BH<\/p><\/td><td><p>Ongoing<\/p><\/td><td><p>Baringo Central<\/p><\/td><td><p>Drilling and test pumping phase<\/p><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c537c67 elementor-widget elementor-widget-text-editor\" data-id=\"c537c67\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Future Planning &amp; Proposed Projects<\/strong><\/p><ul><li>National Urban Phase II: Proposed projects include Kabartonjo Water Supply, Marigat Water Supply, Marigat Sewerage, and Mogotio Sewerage.<\/li><li>Priority PPP Dams: Recommended for Public-Private Partnerships are Bergei Dam (6.4B), Narosura Dam (5.4B), and Saimo Soi Dam (10B).<\/li><li>Studies: Feasibility studies are identified for the Chemolingot, Barwesa, and Kipsaraman water supply cluster and the Emining Sewerage project.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-159f607 e-flex e-con-boxed e-con e-parent\" data-id=\"159f607\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-62bb8ce elementor-widget elementor-widget-ucaddon_blox_line_diamond_seperator\" data-id=\"62bb8ce\" data-element_type=\"widget\" data-widget_type=\"ucaddon_blox_line_diamond_seperator.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\n<!-- start Line Diamond Separator -->\n<style>\/* widget: Line Diamond Separator *\/\n\ndiv.sep_diamond {\ncontent: \"\";\nheight: 10px;\nleft: 50%;\nmargin: -5px auto auto -5px;\nposition: absolute;\ntransform: rotate(-45deg);\nwidth: 10px;\n}\ndiv.separator {\nborder-top:1px solid;\nclear: both;\ndisplay:inline-block;\nposition:relative;\n}\n\n<\/style>\n\n<div style=\"text-align:center;\">\n <div class=\"separator\" style=\"border-color:#8AC73F;width:100px;\">\n  <div class=\"sep_diamond\" style=\"background-color:#8AC73F;\"><\/div>\n <\/div>\n<\/div>\n<!-- end Line Diamond Separator -->\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-cef2c17 e-flex e-con-boxed e-con e-parent\" data-id=\"cef2c17\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-153e165 eael-dual-header-content-align-center elementor-widget elementor-widget-eael-dual-color-header\" data-id=\"153e165\" data-element_type=\"widget\" data-widget_type=\"eael-dual-color-header.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t<div class=\"eael-dual-header\">\n\t\t\t\t\t\t\t\t<h2 class=\"title eael-dch-title\"><span class=\"eael-dch-title-text eael-dch-title-lead lead solid-color\">service<\/span> <span class=\"eael-dch-title-text\">charter<\/span><\/h2>\t\t\t\t<span class=\"subtext\"><\/span>\n\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-3c2ea87 e-flex e-con-boxed e-con e-parent\" data-id=\"3c2ea87\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-ed1b581 e-con-full e-flex e-con e-child\" data-id=\"ed1b581\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6996aa2 elementor-widget elementor-widget-video\" data-id=\"6996aa2\" data-element_type=\"widget\" data-settings=\"{&quot;youtube_url&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch?v=E-_oGeubP0E&amp;t=1s&quot;,&quot;video_type&quot;:&quot;youtube&quot;,&quot;controls&quot;:&quot;yes&quot;}\" data-widget_type=\"video.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-wrapper elementor-open-inline\">\n\t\t\t<div class=\"elementor-video\"><\/div>\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8748a9e elementor-widget elementor-widget-heading\" data-id=\"8748a9e\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Service Charter Sign Language<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-97f332b e-con-full e-flex e-con e-child\" data-id=\"97f332b\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5bf8132 elementor-widget elementor-widget-embedpres_elementor\" data-id=\"5bf8132\" data-element_type=\"widget\" data-widget_type=\"embedpres_elementor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\n\t\t<div class=\"embedpress-elements-wrapper  \" id=\"ep-elements-id-5bf8132\">\n\n\t\t\t\t\t\t\t<div id=\"ep-elementor-content-5bf8132\"\n\t\t\t\t\tclass=\"ep-elementor-content\n\t\t\t\t\t\t\t\t\t\t  ep-content-protection-disabled\t\t\t\t\tsource-default\t\t\t\t\t\">\n\n\t\t\t\t\t<div id=\"5bf8132\"\n\t\t\t\t\t\tclass=\"ep-embed-content-wrapper\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tep-google-photos-\t\t\t\t\t\t\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t>\n\n\t\t\t\t\t\t<div id=\"ep-elementor-content-5bf8132\"\n\t\t\t\t\t\t\tclass=\"ep-elementor-content\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t  ep-content-protection-disabled\t\t\t\t\t\t\tsource-default\">\n\n\t\t\t\t\t\t\t<div >\n\t\t\t\t\t\t\t\t<div id=\"5bf8132\"\n\t\t\t\t\t\t\t\t\tclass=\"ep-embed-content-wraper\n\t\t\t\t\t\t\t\t\t\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t>\n\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\n\t\t\t\n\t\t<\/div>\n\n\n\t\t\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb9d997 elementor-widget elementor-widget-text-editor\" data-id=\"cb9d997\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><audio class=\"wp-audio-shortcode\" id=\"audio-1726-1\" preload=\"none\" style=\"width: 100%;\" controls=\"controls\"><source type=\"audio\/mpeg\" src=\"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-content\/uploads\/2026\/02\/CRVWWDA_Audio.mp3?_=1\" \/><a href=\"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-content\/uploads\/2026\/02\/CRVWWDA_Audio.mp3\">https:\/\/dev1.kenyaonline.com\/crvwda\/wp-content\/uploads\/2026\/02\/CRVWWDA_Audio.mp3<\/a><\/audio><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a626668 elementor-widget elementor-widget-heading\" data-id=\"a626668\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Service Charter Audio<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Baringo Major Flagship Infrastructure \u2022 Chemususu Dam Water Supply Project: The project has reached an overall completion status of 98%. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_eb_attr":"","site-sidebar-layout":"no-sidebar","site-content-layout":"","ast-site-content-layout":"full-width-container","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"disabled","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-1726","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages\/1726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/comments?post=1726"}],"version-history":[{"count":16,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages\/1726\/revisions"}],"predecessor-version":[{"id":2749,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages\/1726\/revisions\/2749"}],"wp:attachment":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/media?parent=1726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}