{"id":1736,"date":"2025-11-10T11:42:49","date_gmt":"2025-11-10T11:42:49","guid":{"rendered":"https:\/\/dev1.kenyaonline.com\/crvwda\/?page_id=1736"},"modified":"2026-02-25T10:38:32","modified_gmt":"2026-02-25T10:38:32","slug":"nakuru","status":"publish","type":"page","link":"https:\/\/dev1.kenyaonline.com\/crvwda\/nakuru\/","title":{"rendered":"Nakuru"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"1736\" class=\"elementor elementor-1736\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c33270f e-flex e-con-boxed e-con e-parent\" data-id=\"c33270f\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-eaa6962 elementor-widget elementor-widget-heading\" data-id=\"eaa6962\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Nakuru\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-61e7b72 e-flex e-con-boxed e-con e-parent\" data-id=\"61e7b72\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6836a47 elementor-widget elementor-widget-text-editor\" data-id=\"6836a47\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ol><li style=\"list-style-type: none;\"><ol><li><strong> Major Flagship Infrastructure<\/strong><\/li><\/ol><\/li><\/ol><ul><li style=\"list-style-type: none;\"><ul><li><strong>Itare Dam Water Supply Project (Vision 2030): <\/strong><ul><li>Status: The project is on the resumption roadmap. Following the resolution of ICC disputes and the signing of a settlement agreement, implementation is being tracked for the restart of works.<\/li><li>Scope: A <strong>57m high dam<\/strong> with a 100,000m\u00b3\/day treatment plant and 110km of bulk conveyance pipeline.<\/li><li>Impact: Designed to serve <strong>800,000 people<\/strong> in Nakuru City, Molo, Njoro, Kuresoi, and Rongai areas.<\/li><\/ul><\/li><li><strong>Lake Nakuru Biodiversity Conservation Project: <\/strong><ul><li>Status: Contracts for <strong>Lot 1 (Njoro WWTP) and Lot 2 (Water Supply improvement)<\/strong> have been awarded, and contractors are currently mobilizing. Lot 3 (Sewer system and rehabilitation) is currently under procurement.<\/li><li>Scope: Funded by KfW and GoK (Ksh 5 Billion), it includes a new 60,000m\u00b3\/day pretreatment works, 12 new boreholes, and the rehabilitation of 65km of sewer networks.<\/li><\/ul><\/li><li><strong>Naivasha Industrial Park (NIP) Water Supply Project: <\/strong><ul><li>Status: The short-term intervention is 100% complete and was handed over to the Naivasha Water and Sanitation Company (NAIVAWASSCO) after the Defect Notification Period.<\/li><li>Scope: Developed a water source capable of supplying 10,000m\u00b3\/day to the Special Economic Zone.<\/li><\/ul><\/li><li><strong>Kinamba-Kayole Water Project: <\/strong><ul><li>Status: A National Urban Program Phase 1 project currently in the documentation repackaging phase for tendering.<\/li><li>Impact: A Ksh 700 Million project designed to benefit <strong>52,300<\/strong> people in the outskirts of Naivasha through new storage tanks and reticulation.<\/li><\/ul><\/li><\/ul><\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-159f607 e-flex e-con-boxed e-con e-parent\" data-id=\"159f607\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-62bb8ce elementor-widget elementor-widget-ucaddon_blox_line_diamond_seperator\" data-id=\"62bb8ce\" data-element_type=\"widget\" data-widget_type=\"ucaddon_blox_line_diamond_seperator.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\n<!-- start Line Diamond Separator -->\n<style>\/* widget: Line Diamond Separator *\/\n\ndiv.sep_diamond {\ncontent: \"\";\nheight: 10px;\nleft: 50%;\nmargin: -5px auto auto -5px;\nposition: absolute;\ntransform: rotate(-45deg);\nwidth: 10px;\n}\ndiv.separator {\nborder-top:1px solid;\nclear: both;\ndisplay:inline-block;\nposition:relative;\n}\n\n<\/style>\n\n<div style=\"text-align:center;\">\n <div class=\"separator\" style=\"border-color:#8AC73F;width:100px;\">\n  <div class=\"sep_diamond\" style=\"background-color:#8AC73F;\"><\/div>\n <\/div>\n<\/div>\n<!-- end Line Diamond Separator -->\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2865d0e e-flex e-con-boxed e-con e-parent\" data-id=\"2865d0e\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-8360b71 e-con-full e-flex e-con e-child\" data-id=\"8360b71\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6fe3e88 e-n-tabs-mobile elementor-widget elementor-widget-n-tabs\" data-id=\"6fe3e88\" data-element_type=\"widget\" data-settings=\"{&quot;horizontal_scroll&quot;:&quot;disable&quot;}\" data-widget_type=\"nested-tabs.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-tabs\" data-widget-number=\"117325448\" aria-label=\"Tabs. Open items with Enter or Space, close with Escape and navigate using the Arrow keys.\">\n\t\t\t<div class=\"e-n-tabs-heading\" role=\"tablist\">\n\t\t\t\t\t<button id=\"e-n-tab-title-1173254481\" class=\"e-n-tab-title\" aria-selected=\"true\" data-tab-index=\"1\" role=\"tab\" tabindex=\"0\" aria-controls=\"e-n-tab-content-1173254481\" style=\"--n-tabs-title-order: 1;\">\n\t\t\t\t\t\t<span class=\"e-n-tab-title-text\">\n\t\t\t\tCOMPLETED PROJECTS (Date to Date)\t\t\t<\/span>\n\t\t<\/button>\n\t\t\t\t<button id=\"e-n-tab-title-1173254482\" class=\"e-n-tab-title\" aria-selected=\"false\" data-tab-index=\"2\" role=\"tab\" tabindex=\"-1\" aria-controls=\"e-n-tab-content-1173254482\" style=\"--n-tabs-title-order: 2;\">\n\t\t\t\t\t\t<span class=\"e-n-tab-title-text\">\n\t\t\t\tONGOING PROJECTS\t\t\t<\/span>\n\t\t<\/button>\n\t\t\t\t\t<\/div>\n\t\t\t<div class=\"e-n-tabs-content\">\n\t\t\t\t<div id=\"e-n-tab-content-1173254481\" role=\"tabpanel\" aria-labelledby=\"e-n-tab-title-1173254481\" data-tab-index=\"1\" style=\"--n-tabs-title-order: 1;\" class=\"e-active elementor-element elementor-element-5e6964f e-con-full e-flex e-con e-child\" data-id=\"5e6964f\" data-element_type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-a7cb3c3 e-flex e-con-boxed e-con e-child\" data-id=\"a7cb3c3\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-44a2655 elementor-widget elementor-widget-text-editor\" data-id=\"44a2655\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Nakuru County has seen the completion of over 60 significant community water, health, and education infrastructure projects.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cc6bc09 elementor-widget elementor-widget-text-editor\" data-id=\"cc6bc09\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<table><thead><tr><td><p><strong>No.<\/strong><\/p><\/td><td><p><strong>Project Name<\/strong><\/p><\/td><td><p><strong>Scope of Works<\/strong><\/p><\/td><td><p><strong>Sub-County<\/strong><\/p><\/td><td><p><strong>Beneficiaries<\/strong><\/p><\/td><\/tr><\/thead><tbody><tr><td><p>1<\/p><\/td><td><p>Rongai LMC (Lot 1 &amp; 2)<\/p><\/td><td><p>46.2km pipeline &amp; elevated tanks<\/p><\/td><td><p>Rongai<\/p><\/td><td><p>13,500<\/p><\/td><\/tr><tr><td><p>2<\/p><\/td><td><p>Kaagreen Small Dam<\/p><\/td><td><p>Dam construction &amp; earthworks<\/p><\/td><td><p>Molo<\/p><\/td><td><p>2,000<\/p><\/td><\/tr><tr><td><p>3<\/p><\/td><td><p>Kivulini Small Dam<\/p><\/td><td><p>Dam construction &amp; earthworks<\/p><\/td><td><p>Molo<\/p><\/td><td><p>1,500<\/p><\/td><\/tr><tr><td><p>4<\/p><\/td><td><p>Nakurtakwei Water Project<\/p><\/td><td><p>Small dam expansion &amp; desilting<\/p><\/td><td><p>E\/Ravine\/Nakuru<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>5<\/p><\/td><td><p>Chemasis Community BH<\/p><\/td><td><p>Equipping and civil works<\/p><\/td><td><p>Rongai<\/p><\/td><td><p>2,000<\/p><\/td><\/tr><tr><td><p>6<\/p><\/td><td><p>Sundu River Borehole<\/p><\/td><td><p>Equipping and civil works<\/p><\/td><td><p>Kuresoi North<\/p><\/td><td><p>4,500<\/p><\/td><\/tr><tr><td><p>7<\/p><\/td><td><p>Bahati II BH Project<\/p><\/td><td><p>Drilling and Equipping<\/p><\/td><td><p>Nakuru North<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>8<\/p><\/td><td><p>Solarization (Kabazi BH)<\/p><\/td><td><p>Pump installation &amp; solar units<\/p><\/td><td><p>Subukia<\/p><\/td><td><p>4,000<\/p><\/td><\/tr><tr><td><p>9<\/p><\/td><td><p>Kanjogo Water Project<\/p><\/td><td><p>Borehole rehabilitation &amp; flushing<\/p><\/td><td><p>Naivasha<\/p><\/td><td><p>3,000<\/p><\/td><\/tr><tr><td><p>10<\/p><\/td><td><p>Karunga Manunga BH<\/p><\/td><td><p>24m\u00b3 steel tank &amp; 2km LMC<\/p><\/td><td><p>Gilgil<\/p><\/td><td><p>2,500<\/p><\/td><\/tr><tr><td><p>11<\/p><\/td><td><p>Gatongu-Subukia BH<\/p><\/td><td><p>Drilling, equipping &amp; civil works<\/p><\/td><td><p>Subukia<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>12<\/p><\/td><td><p>Sigito Community BH<\/p><\/td><td><p>Equipping and civil works<\/p><\/td><td><p>Rongai<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>13<\/p><\/td><td><p>Kapchorwa Community BH<\/p><\/td><td><p>Equipping and solarization<\/p><\/td><td><p>Kuresoi North<\/p><\/td><td><p>4,500<\/p><\/td><\/tr><tr><td><p>14<\/p><\/td><td><p>Ogilgei-Ngata BH<\/p><\/td><td><p>Drilling and capping<\/p><\/td><td><p>Ngata<\/p><\/td><td><p>3,500<\/p><\/td><\/tr><tr><td><p>15<\/p><\/td><td><p>Kuresoi Health Centre BH<\/p><\/td><td><p>Equipping &amp; elevated tower<\/p><\/td><td><p>Kuresoi<\/p><\/td><td><p>6,000<\/p><\/td><\/tr><tr><td><p>16<\/p><\/td><td><p>Mau Summit BH<\/p><\/td><td><p>Pump and solar installation<\/p><\/td><td><p>Kuresoi North<\/p><\/td><td><p>4,200<\/p><\/td><\/tr><tr><td><p>17<\/p><\/td><td><p>St. Alex Kabianga BH<\/p><\/td><td><p>Drilling, equipping &amp; civil works<\/p><\/td><td><p>Nakuru<\/p><\/td><td><p>1,500<\/p><\/td><\/tr><tr><td><p>18<\/p><\/td><td><p>Elburgon MTVC BH<\/p><\/td><td><p>Drilling, equipping &amp; civil works<\/p><\/td><td><p>Molo<\/p><\/td><td><p>1,000<\/p><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-df8a35c elementor-widget elementor-widget-text-editor\" data-id=\"df8a35c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>(Note: In total, 67 individual community and school borehole\/dam projects are complete in Nakuru since 2020.)<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div id=\"e-n-tab-content-1173254482\" role=\"tabpanel\" aria-labelledby=\"e-n-tab-title-1173254482\" data-tab-index=\"2\" style=\"--n-tabs-title-order: 2;\" class=\" elementor-element elementor-element-3e09d40 e-con-full e-flex e-con e-child\" data-id=\"3e09d40\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d38e5e8 elementor-widget elementor-widget-text-editor\" data-id=\"d38e5e8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<table><thead><tr><td><p><strong>No.<\/strong><\/p><\/td><td><p><strong>Project Name<\/strong><\/p><\/td><td><p><strong>Progress Status<\/strong><\/p><\/td><td><p><strong>Sub-County<\/strong><\/p><\/td><td><p><strong>Remarks<\/strong><\/p><\/td><\/tr><\/thead><tbody><tr><td><p>1<\/p><\/td><td><p>Nguso-Rafiki LMC<\/p><\/td><td><p>20%<\/p><\/td><td><p>Rongai<\/p><\/td><td><p>15.5km main trunk works ongoing<\/p><\/td><\/tr><tr><td><p>2<\/p><\/td><td><p>Kiambereria Water Project<\/p><\/td><td><p>95%<\/p><\/td><td><p>Molo<\/p><\/td><td><p>Pending cattle trough &amp; pipeline<\/p><\/td><\/tr><tr><td><p>3<\/p><\/td><td><p>Arimi Pri &amp; Community BH<\/p><\/td><td><p>95%<\/p><\/td><td><p>Molo<\/p><\/td><td><p>Test pumping complete<\/p><\/td><\/tr><tr><td><p>4<\/p><\/td><td><p>Chorwet Primary School<\/p><\/td><td><p>90%<\/p><\/td><td><p>Njoro<\/p><\/td><td><p>Equipping done; pending civil works<\/p><\/td><\/tr><tr><td><p>5<\/p><\/td><td><p>Kapsebeltin Community BH<\/p><\/td><td><p>95%<\/p><\/td><td><p>Rongai<\/p><\/td><td><p>Requires last mile phase<\/p><\/td><\/tr><tr><td><p>6<\/p><\/td><td><p>Rising Mains (Ngata BH)<\/p><\/td><td><p>60%<\/p><\/td><td><p>Rongai<\/p><\/td><td><p>3km of pipeline complete<\/p><\/td><\/tr><tr><td><p>7<\/p><\/td><td><p>Tipis Secondary School<\/p><\/td><td><p>Ongoing<\/p><\/td><td><p>Nakuru<\/p><\/td><td><p>Borehole drilling &amp; capping<\/p><\/td><\/tr><tr><td><p>8<\/p><\/td><td><p>Mauche Dam<\/p><\/td><td><p>Planning<\/p><\/td><td><p>Nakuru<\/p><\/td><td><p>Design phase for distribution<\/p><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-002b1c6 e-flex e-con-boxed e-con e-parent\" data-id=\"002b1c6\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5393f72 elementor-widget elementor-widget-text-editor\" data-id=\"5393f72\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ol><li style=\"list-style-type: none;\"><ol start=\"4\"><li><strong> Future Planning &amp; Strategic Studies<\/strong><\/li><\/ol><\/li><\/ol><ul><li style=\"list-style-type: none;\"><ul><li>National Urban Phase II: Proposed projects include the Sogonin-Menengai Water Supply, Gilgil-Kikopey Water Supply, and Gilgil-Kikopey Sewerage.<\/li><li>Proposed Sewerage Works: Urban systems are planned for Naivasha Town (Ksh 3B), Molo (Ksh 1B), and Keringet-Olenguruone (Ksh 2.5B).<\/li><li>Priority PPP Dams: Several dams are recommended for Public-Private Partnerships, including Upper Solai (Ksh 5B), Kaprop Dam (Ksh 6B), and the Malewa Multi-Purpose Dam.<\/li><li>Strategic Studies: Clusters identified for feasibility include Kabazi-Subukia-Bahati, Naivasha Industrial Park reticulation, and the Mau Summit-Olenguruone-Total cluster.<\/li><\/ul><\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-cef2c17 e-flex e-con-boxed e-con e-parent\" data-id=\"cef2c17\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-153e165 eael-dual-header-content-align-center elementor-widget elementor-widget-eael-dual-color-header\" data-id=\"153e165\" data-element_type=\"widget\" data-widget_type=\"eael-dual-color-header.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t<div class=\"eael-dual-header\">\n\t\t\t\t\t\t\t\t<h2 class=\"title eael-dch-title\"><span class=\"eael-dch-title-text eael-dch-title-lead lead solid-color\">service<\/span> <span class=\"eael-dch-title-text\">charter<\/span><\/h2>\t\t\t\t<span class=\"subtext\"><\/span>\n\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-3c2ea87 e-flex e-con-boxed e-con e-parent\" data-id=\"3c2ea87\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-ed1b581 e-con-full e-flex e-con e-child\" data-id=\"ed1b581\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6996aa2 elementor-widget elementor-widget-video\" data-id=\"6996aa2\" data-element_type=\"widget\" data-settings=\"{&quot;youtube_url&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch?v=E-_oGeubP0E&amp;t=1s&quot;,&quot;video_type&quot;:&quot;youtube&quot;,&quot;controls&quot;:&quot;yes&quot;}\" data-widget_type=\"video.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-wrapper elementor-open-inline\">\n\t\t\t<div class=\"elementor-video\"><\/div>\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8748a9e elementor-widget elementor-widget-heading\" data-id=\"8748a9e\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Service Charter Sign Language<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-97f332b e-con-full e-flex e-con e-child\" data-id=\"97f332b\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5bf8132 elementor-widget elementor-widget-embedpres_elementor\" data-id=\"5bf8132\" data-element_type=\"widget\" data-widget_type=\"embedpres_elementor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\n\t\t<div class=\"embedpress-elements-wrapper  \" id=\"ep-elements-id-5bf8132\">\n\n\t\t\t\t\t\t\t<div id=\"ep-elementor-content-5bf8132\"\n\t\t\t\t\tclass=\"ep-elementor-content\n\t\t\t\t\t\t\t\t\t\t  ep-content-protection-disabled\t\t\t\t\tsource-default\t\t\t\t\t\">\n\n\t\t\t\t\t<div id=\"5bf8132\"\n\t\t\t\t\t\tclass=\"ep-embed-content-wrapper\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tep-google-photos-\t\t\t\t\t\t\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t>\n\n\t\t\t\t\t\t<div id=\"ep-elementor-content-5bf8132\"\n\t\t\t\t\t\t\tclass=\"ep-elementor-content\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t  ep-content-protection-disabled\t\t\t\t\t\t\tsource-default\">\n\n\t\t\t\t\t\t\t<div >\n\t\t\t\t\t\t\t\t<div id=\"5bf8132\"\n\t\t\t\t\t\t\t\t\tclass=\"ep-embed-content-wraper\n\t\t\t\t\t\t\t\t\t\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t>\n\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\n\t\t\t\n\t\t<\/div>\n\n\n\t\t\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-feeb22e elementor-widget elementor-widget-text-editor\" data-id=\"feeb22e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><audio class=\"wp-audio-shortcode\" id=\"audio-1736-1\" preload=\"none\" style=\"width: 100%;\" controls=\"controls\"><source type=\"audio\/mpeg\" src=\"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-content\/uploads\/2026\/02\/CRVWWDA_Audio.mp3?_=1\" \/><a href=\"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-content\/uploads\/2026\/02\/CRVWWDA_Audio.mp3\">https:\/\/dev1.kenyaonline.com\/crvwda\/wp-content\/uploads\/2026\/02\/CRVWWDA_Audio.mp3<\/a><\/audio><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a626668 elementor-widget elementor-widget-heading\" data-id=\"a626668\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Service Charter Audio<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Nakuru Major Flagship Infrastructure Itare Dam Water Supply Project (Vision 2030): Status: The project is on the resumption roadmap. Following [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_eb_attr":"","site-sidebar-layout":"no-sidebar","site-content-layout":"","ast-site-content-layout":"full-width-container","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"disabled","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-1736","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages\/1736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/comments?post=1736"}],"version-history":[{"count":14,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages\/1736\/revisions"}],"predecessor-version":[{"id":2761,"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/pages\/1736\/revisions\/2761"}],"wp:attachment":[{"href":"https:\/\/dev1.kenyaonline.com\/crvwda\/wp-json\/wp\/v2\/media?parent=1736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}